Material Placement, Without the Hand Crew

Gravel, road base, fill dirt, topsoil, sand, cobble, and mulch placed exactly where your crew marked it. Up to 100 cubic yards an hour, from the street.

100yd³/hr
Material placed per hour
60ft
Telescoping reach
240°
Boom rotation
5min
On-site setup
Gravel flying off the end of the Beltline telescoping beltOne pass
The problem we solve

Put the Material Where It Goes the First Time

Dump trucks drop material where the truck can get, not where the job needs it. Then your crew moves it again, by wheelbarrow or skid steer, across the grade you just finished. Beltline skips the double handling. The truck or your loader feeds the hopper on the street, and the belt puts it over the fence, behind the house, along the trench, or across the lot. One pass.

  • Backyards, side yards, and tight lots with no equipment access
  • Landscape rock and cobble placed over finished hardscape
  • Road base and gravel for driveways, pads, and RV parking
  • Topsoil and mulch spread across a yard from one setup
Why it works

Built for Bulk Material on Tight Sites

Dump truck direct

The hopper is sized for a dump truck. The driver backs up to the trailer on the street and dumps straight in. No staging pile.

4-inch minus

Gravel, road base, cobble, sand, topsoil, and mulch. Anything to 4-inch minus runs without changing the setup.

Most of a lot per setup

60 feet of reach, 70 feet of sling, 240 degrees of rotation. Most residential lots are covered without moving the trailer.

Spread or pile

Variable belt speed and a proportional remote. We can lay an even layer across a yard or stack it exactly where the crew wants the pile.

Crew member raking landscape rock placed by the conveyor
Who calls us

Landscapers, Builders, and Site Crews

Hardscape installers placing rock and cobble over a finished patio. Home builders backfilling and spreading road base on a lot the loader cannot cross. Excavation and site-prep crews who would rather keep the skid steer digging than hauling. If your crew is moving material by hand, this pays for itself the first morning.

  • Landscapers and hardscape installers
  • General contractors and home builders
  • Excavation and site-prep contractors
  • Concrete and foundation crews
How it works

Book It. We Handle the Material Side.

01

Tell us the job

Call or send the form: material, rough yardage, where it needs to land, and the date. You get a quote, not a sales pitch.

02

We tow in and set up

The trailer parks on the street or driveway. Outriggers down, boom out, and we are placing in about 5 minutes.

03

You keep building

Your loader feeds the hopper. We run the remote and put the material where the crew marked it. Up to 100 yards an hour.

Questions

Material Placement FAQ

What materials can you place?

Concrete (up to a 6-inch slump), gravel, road base, fill dirt, topsoil, sand, cobble, bark and mulch, and aggregate up to 4-inch minus. The machine runs everything from dirt to concrete with almost no change in setup.

How much material can it move?

Up to 100 cubic yards an hour. A full mixer can be cleared in about 15 minutes. The belt speed is variable, so we slow it down for concrete and run it fast for spreading gravel or dirt.

How far can it reach?

60 feet of telescoping reach, plus up to 70 feet of slinging distance, with 240 degrees of rotation. From one setup the machine covers most of a residential lot without moving the trailer.

What do I need to have on site?

Something to feed the hopper: a skid steer, loader, dump truck, or mixer all work. The hopper is sized for dump trucks and 4-inch minus material. We also need room to park the trailer, roughly 30 feet by 8 feet, near the placement area.

Will it tear up finished work?

That is the point of the machine. The trailer never leaves the street or driveway, and the boom places material over the top of fences, retaining walls, curbs, and finish grade. No skid steer tracks across the yard, no ruts from a loaded truck.

All questions

Quote a material job

Tell us what you are placing and where. We usually reply within one business day. Need it sooner? Call.

Or call (435) 534-6978. By submitting you agree to our privacy policy.

Have a pile that needs to be somewhere else?

Send the yardage and the address. We will quote it by the next business day.

CallGet a quote